Saturday, August 4, 2012

Kandil Dam and HEPP

This project, being one of the Kandil Power Group Projects, is located in the Upper Ceyhan basin upstream of the Menzelet Dam on the Ceyhan River in Kahramanmaraş. The dam is rock-fill type with concrete covered front face having the installed capacity of 210 MW and annual energy generation of 502 GWh.
Client Hydroelectric Production and Trade, Inc. (ENERJİSA)

0 comments:

  © Blogger templates Psi by Ourblogtemplates.com 2008

Back to TOP